Las Mulas – Las Capillas

Cubillos, Zamora (Spain)

Opdenergy has started operations at the Las Mulas – Las Capillas Solar Project, an 85 MWp photovoltaic plant located in Cubillos, Zamora, Spain. The project spans approximately 258 hectares.

Scope of the project

85 Peak Power (MW)
61 Rated Power at POC (MW)
258 Area (ha)

Gallery

Technical information

Modules

  • Manufacturer: EGING
  • Module Model: EG-660M66-HUBF-DG
  • Module Power (Wdc): 660
  • Number of Modules: 128,790

Modules

  • Manufacturer: EGING
  • Module Model: EG-660M66-HUBF-DG
  • Module Power (Wdc): 660
  • Number of Modules: 128,790

 

Modules

  • Manufacturer: EGING
  • Module Model: EG-660M66-HUBF-DG
  • Module Power (Wdc): 660
  • Number of Modules: 128,790

360º view